Gwynn's Garden IV
The limestone is now on the path and we have lovely flower beds on either side of the entrance to add color. The plaque has been ordered that will have Gwynn’s name and a scripture. I’ve been told that will take nine weeks so it looks like the dedication will probably be sometime during the summer. I want to wait until everything is completed and installed before I set a date for the dedication. The contributions to date total $8429 and we have 56 contributors. I walk the labyrinth now every time I am at the Fraser Center.